PHASE TWO DRAWING: PHASE ONE DRAWING
PHASE TWO DRAWING KEY FEATURES:
1. 70,000 ± seat football stadium built in phase one to the
East.
2. Build a 40,000 ± seat Baseball Stadium to the West.
3. Existing Kirby Puckett Plaza West across Chicago Ave.
4. Operable outfield window with downtown view.
5. New South and East Plazas.
6. Roof above shown dashed.
7. Service court and loading dock on North side of building.
8. Metro Dome Cooling tower reused for new stadium complex